Closing scheduled for Interstate 229 southbound on-ramp at Benson Road

SIOUX FALLS Starting May 20 and continuing through July 1, the Interstate 229 southbound on-ramp at the Benson Road Diverging Diamond Interchange construction project will be closed for the installation of utilities, grading, and concrete surfacing.

During the month-long closure, I-229 on-ramp traffic will be detoured to Benson Road, Cliff Avenue, and Rice Street. Benson Road will remain open from Cliff Avenue to I-229. Access will be maintained to businesses throughout the project.

Motorists should be prepared for delays and use alternate routes during peak travel times through the I-229 and Benson Road construction project. Drivers are urged to use caution and reduce their speed while traveling through the area. Traffic control measures will continue to guide motorists around all closures.

The project will reconstruct approximately 1.5 miles of Benson Road and 1 mile of I-229 ramps. Work includes construction of a DDI, constructing a structure, grading, concrete surfacing, curb and gutter, storm sewer, lighting, signals, permanent signing and pavement marking.

The prime contractor for this $34.3 million project is T&R Contracting of Sioux Falls. The overall completion date for this project is June 27, 2025.

Find additional information about this project at https://dot.sd.gov/bensonroad-i-229-pcn-04xk.

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *